Ebb and flow execution

  • Here we start off with preparatory groundworks, using laser guided material.

    We add the watertight EPDM foil or LDPE foil and place it behind the curbstone or hardwooden bordering.

    The necessary drainage pipes are coupled with the elevating and drainage system (there is a choice between a manual, half or full automatic control)

    Then we apply a substratum of about 20 cm thick, levelled and compacted sand. Afterwards we add a 12 cm thick upper layer, without the addition of geopat or other additives.

    If necessary, It would be our pleasure to come on the spot to talk over the possibilities and provide you with more information.